Los Angeles County, the Inland Empire, and surrounding cities

Pre-wiring

New construction and remodel pre-wiring.

The easiest time to run cable is while the walls are still open. We plan network, camera, Wi-Fi, door-entry, and audio/TV pathways with you before insulation and drywall go in.

Timing

When to bring us in.

Call or email as the framing is going up, or as soon as a remodel opens the walls. Earlier is better than trying to fish cable through finished rooms later.

Before insulation and drywall

Open walls, cleaner work

We prefer to pull and fasten cable after the house is framed and before insulation and drywall. That keeps runs protected, labeled, and out of the way of the trades that follow.

Remodels

While a room is already open

If a kitchen, addition, or whole-house remodel has walls open for other work, that is a good window to add network drops, camera paths, and speaker or TV wiring in the same pass.

Scope

What gets wired.

We plan only what the home needs. Typical pre-wire paths include the systems we already install on finished homes.

Network cabling

Ethernet throughout

Runs to offices, living rooms, TV locations, and a central network closet so devices can use a wired connection.

Cameras

Security camera paths

Cable to planned indoor and outdoor camera locations, with power and recording considered as part of the layout.

Wi-Fi

Access point locations

Wired backhaul to ceiling or wall locations so Wi-Fi can be even later, instead of relying only on a single router.

Door entry

Readers and gates

Pathways for door readers, intercoms, and gate connections so entry equipment is not an afterthought.

Audio & TV

Speakers and displays

Speaker wire, TV outlets, and related low-voltage paths in the rooms you want ready on day one.

Documentation

Labeled, documented runs

Each run is labeled, and we leave a clear record of what was pulled and where it lands, so future work is easier to follow.

How we pull cable

Protected on the way in, and on the finished house.

We fasten and label every pre-wire run, and we use the proper conduit or raceway where cable would otherwise be exposed. The same standard carries through to the final install: no dangling wires, sealed wall penetrations, and a tidy closet. Some installers rush to finish. We don’t.

On the job site

Working around the builder’s schedule.

We coordinate with you and your general contractor so our visits fit the construction calendar. The goal is to be on site when the walls are open and out of the way when other trades need the space.

A walkthrough or written plan comes first: we look at the drawings or the framed house, mark locations with you, and agree on what will be pulled before cable goes in.

How a pre-wire starts

Walkthrough or plan

Share plans or invite us to the site. We review rooms, camera views, Wi-Fi coverage, door-entry points, and TV or speaker locations, then confirm the pull list with you before work begins.

Get in touch

Schedule a pre-wire walkthrough.

Email or call to set up a visit. Tell us the property address, the builder or GC if you have one, and roughly when insulation or drywall is expected.

Email about a pre-wire walkthrough Call (323) 788-3553